Wednesday, 25 March 2015 00:00
Rate this item
(0 votes)

At present, our company is involved in construction of polymer-bitumen binder (PBB) and road bitumen plant in Orenburg region. Finishing of construction is planned for the III quarter of 2016.

 


Planned production capacity - 45 thousand tons of crude oil per year. The raw material for the production is low quality oil with admixtures of salts and high sulfur content.

Besides the main products - 9.48 polymer-bitumen binder and 3.45 thousand tons per year of road bitumen (if necessary number of PBB can be brought to 12.93, while the BND is not issued)   the following related products are planned to be provided:

  • Broad fraction of light distillates - 9.56 thousand tons per year
  • Fraction 250 ... 350 °C - 4.51 thousand tons per year
  • Fraction 200 ... 350 ° C - 1.22 thousand tons per year
  • Fraction 350 ... 450 ° C - 2.90 thousand tons per year
  • Black Solar - 0.31 thousand tons per year
  • Heavy fuel oil M40 - 6.99 thousand tons per year

 

stages of construction

 

Read 2056 times Last modified on Wednesday, 08 April 2015 14:05

Latest from Press Service of "MGE" Company